Healthcare



Kaiser Permanente
South San Francisco, CA
​
1. Kaiser Hospital in south san Francisco (SSF)- Providing Mechanical Infrastructure Study for the existing major mechanical equipment in the Low-Rise Hospital Tower, Medical Office Building (MOB), and Orchid Center. The hospital is under OSHPD jurisdiction.
​
2. MEP Tenant improvement for miscellaneous renovation for the hospital and medical office building.
Kaiser Permanente
2425 Geary Blvd., San Francisco, CA
​
Mechanical, Electrical and Plumbing Design. This was a remodel for an existing Cath Lab #3 for new equipment- Reviewed by OSHPD.
​
New Kaiser Emergency Department
Richmond, CA
Complete Mechanical, Electrical and Plumbing system design for a new Emergency Department in Richmond California.
​
11,000 SF

John Muir Mt. Diablo Health System
Walnut Creek, CA
​
Completed mechanical and plumbing design services for this 4-story, new hospital building. The facility will include Central Sterile, Material Handling, MRI, Cath. Lab, OR’s, Radiology, ICU/CCU and Med. Surg. Patient Rooms.
​
95,000 SF

Kaiser Permanente
Hayward, CA
1. Oncology Department- Tenant improvement for remodeling the entire Oncology Department on second floor to add patient station. Reviewed by OSHPD and under construction.
2. Respiratory Department- Tenant improvement for remodeling the respiratory Therapy Pulmonary Function department. Reviewed by OSHPD.

El Camino New Hospital- 450 bed
Mountain View, CA
​
Complete Mechanical System Design for new hospital. The new building accommodates 450 beds and an emergency room/department. The building also includes an observation unit, a conference center, 16 operating/interventional treatment rooms, a multi-track emergency department and flexible nursing modules.
​
488,000 SF



Mills Peninsula Hospital
Burlingame, CA
​
Mechanical, Electrical and Plumbing Engineering for:
1. Gama Camera room- Complete remodeling of the medical equipment in Gama Camera room and associated mechanical system. D.
​
2. Dialysis Installation in Patient Room 2429- Modify existing Mechanical system to incorporate the addition of the Dialysis unit for patient room 2429.
Kaiser Permanente
San Rafael, CA
​
San Rafael at the corner of Third and A street- square feet of new medical office building (MOB). Complete mechanical system design for three story medical office building. Complete construction in 1990. The MOB includes; Internal Medicine, Eye Care, Dermatology, Cosmetic Services, Nephrology, Pharmacy, Laboratory and Radiology.
​
40,000 SF
Kaiser Medical Center, Building 1 & 2-
3900 Broadway, Oakland, CA
Mechanical, Electrical and Plumbing Engineering for:
​
1. Building #1- Replacing the entire existing mechanical system with new for the two-story medical office building approximately 15,000 square feet. Construction completed in 2015.
2. Building #1- Replacing the entire existing mechanical system with new for the two-story medical office building approximately 15,000 square feet. Construction completed in 2015.