Sustainable Designs, Reliable Solutions

Healthcare

Capture_edited.jpg

Kaiser Permanente

South San Francisco, CA

1.     Kaiser Hospital in south san Francisco (SSF)- Providing Mechanical Infrastructure Study for the existing major mechanical equipment in the Low-Rise Hospital Tower, Medical Office Building (MOB), and Orchid Center. The hospital is under OSHPD jurisdiction.  

2.    MEP Tenant improvement for miscellaneous renovation for the hospital and medical office building.
 

Kaiser  Permanente

2425 Geary Blvd., San Francisco, CA

Mechanical, Electrical and Plumbing Design. This was a remodel for an existing Cath Lab #3 for new equipment- Reviewed by OSHPD. 

New Kaiser Emergency Department
Richmond, CA

 

Complete Mechanical, Electrical and Plumbing system design for a new Emergency Department in Richmond California.

11,000 SF

WalnutCreek_Hospital1_Banner.jpg

John Muir Mt. Diablo Health System

Walnut Creek, CA

Completed mechanical and plumbing design services for this 4-story, new hospital building.  The facility will include Central Sterile, Material Handling, MRI, Cath. Lab, OR’s, Radiology, ICU/CCU and Med. Surg. Patient Rooms. 

95,000 SF

Kaiser Permanente 
Hayward, CA


1.    Oncology Department- Tenant improvement for remodeling the entire Oncology Department on second floor to add patient station. Reviewed by OSHPD and under construction.

2.    Respiratory Department- Tenant improvement for remodeling the respiratory Therapy Pulmonary Function department. Reviewed by OSHPD. 

El Camino New Hospital- 450 bed
Mountain View, CA

Complete Mechanical System Design for new hospital. The new building accommodates 450  beds and an emergency room/department. The building also includes an observation unit, a conference center, 16 operating/interventional treatment rooms, a multi-track emergency department and flexible nursing modules.

488,000 SF

Kaiser%20San%20Rafael_edited.jpg

Mills Peninsula Hospital 
Burlingame, CA

Mechanical, Electrical and Plumbing Engineering for:


1.    Gama Camera room- Complete remodeling of the medical equipment in Gama Camera room and associated mechanical system. D.

2.    Dialysis Installation in Patient Room 2429- Modify existing Mechanical system to incorporate the addition of the Dialysis unit for patient room 2429. 
 

Kaiser Permanente

San Rafael, CA

San Rafael at the corner of Third and A street- square feet of new medical office building (MOB). Complete mechanical system design for three story medical office building. Complete construction in 1990. The MOB includes; Internal Medicine, Eye Care, Dermatology, Cosmetic Services, Nephrology, Pharmacy, Laboratory and Radiology.

40,000 SF

Kaiser Medical Center, Building 1 & 2-
3900 Broadway,  Oakland, CA

 

Mechanical, Electrical and Plumbing Engineering for:

1.    Building #1- Replacing the entire existing mechanical system with new for the two-story medical office building approximately 15,000 square feet. Construction completed in 2015.


2.    Building #1- Replacing the entire existing mechanical system with new for the two-story medical office building approximately 15,000 square feet. Construction completed in 2015.
 