top of page
Sustainable Designs, Reliable Solutions

Healthcare

Capture_edited.jpg

Kaiser Permanente

South San Francisco, CA

​

1.     Kaiser Hospital in south san Francisco (SSF)- Providing Mechanical Infrastructure Study for the existing major mechanical equipment in the Low-Rise Hospital Tower, Medical Office Building (MOB), and Orchid Center. The hospital is under OSHPD jurisdiction.  

​

2.    MEP Tenant improvement for miscellaneous renovation for the hospital and medical office building.
 

Kaiser  Permanente

2425 Geary Blvd., San Francisco, CA

​

Mechanical, Electrical and Plumbing Design. This was a remodel for an existing Cath Lab #3 for new equipment- Reviewed by OSHPD. 

​

New Kaiser Emergency Department
Richmond, CA

 

Complete Mechanical, Electrical and Plumbing system design for a new Emergency Department in Richmond California.

​

11,000 SF

WalnutCreek_Hospital1_Banner.jpg

John Muir Mt. Diablo Health System

Walnut Creek, CA

​

Completed mechanical and plumbing design services for this 4-story, new hospital building.  The facility will include Central Sterile, Material Handling, MRI, Cath. Lab, OR’s, Radiology, ICU/CCU and Med. Surg. Patient Rooms. 

​

95,000 SF

Kaiser Permanente 
Hayward, CA


1.    Oncology Department- Tenant improvement for remodeling the entire Oncology Department on second floor to add patient station. Reviewed by OSHPD and under construction.

2.    Respiratory Department- Tenant improvement for remodeling the respiratory Therapy Pulmonary Function department. Reviewed by OSHPD. 

El Camino New Hospital- 450 bed
Mountain View, CA

​

Complete Mechanical System Design for new hospital. The new building accommodates 450  beds and an emergency room/department. The building also includes an observation unit, a conference center, 16 operating/interventional treatment rooms, a multi-track emergency department and flexible nursing modules.

​

488,000 SF

Kaiser%20San%20Rafael_edited.jpg

Mills Peninsula Hospital 
Burlingame, CA

​

Mechanical, Electrical and Plumbing Engineering for:


1.    Gama Camera room- Complete remodeling of the medical equipment in Gama Camera room and associated mechanical system. D.

​

2.    Dialysis Installation in Patient Room 2429- Modify existing Mechanical system to incorporate the addition of the Dialysis unit for patient room 2429. 
 

Kaiser Permanente

San Rafael, CA

​

San Rafael at the corner of Third and A street- square feet of new medical office building (MOB). Complete mechanical system design for three story medical office building. Complete construction in 1990. The MOB includes; Internal Medicine, Eye Care, Dermatology, Cosmetic Services, Nephrology, Pharmacy, Laboratory and Radiology.

​

40,000 SF

Kaiser Medical Center, Building 1 & 2-
3900 Broadway,  Oakland, CA

 

Mechanical, Electrical and Plumbing Engineering for:

​

1.    Building #1- Replacing the entire existing mechanical system with new for the two-story medical office building approximately 15,000 square feet. Construction completed in 2015.


2.    Building #1- Replacing the entire existing mechanical system with new for the two-story medical office building approximately 15,000 square feet. Construction completed in 2015.
 

bottom of page